Austin (318) 348-4317
Hudredfold Services
Flooring Remodel That Holds Up to Real Life

Family-owned · Austin Local

Flooring Remodel That Holds Up to Real Life

From subfloor inspection to final trim, we install flooring that looks right and stays right.

Free estimate

Tell us what you need

Three fields. It reaches a person here, not a call centre.

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your details with partner companies for marketing purposes.

What a Flooring Remodel Actually Takes

A flooring remodel is one of the highest-impact upgrades you can make to a home, and also one of the easiest to get wrong. Most of the problems we're called in to fix, buckled planks, visible seams, floors that feel soft underfoot, trace back to skipped prep work rather than bad materials. At Hundredfold Services, the subfloor inspection happens before a single plank is measured. We check for level, moisture, and structural issues because what's underneath the floor determines how long the floor lasts. If you've been putting off a flooring remodel and want it handled without having to manage four separate contractors, call Dominique at [(318) 348-4317]( tel:+13183484317) and we'll take it from there.

The cost of a flooring remodel shifts based on several factors: square footage, the condition of the existing subfloor, the material you choose, and how much furniture and trim work is involved. Luxury vinyl plank, laminate, and hardwood each carry different price points and different installation requirements. A straightforward LVP job in a single room lands very differently than a whole-home hardwood installation with custom transitions and baseboard removal. If the subfloor needs leveling or drywall repair is needed along adjacent walls from water damage, that changes the scope too. Every job is different, so contact Hundredfold Services for an accurate estimate rather than working from a number you found online.

Prep Work Determines the Final Result

laminate work, professional service in Austin, TX
Most flooring failures aren't material failures. They're prep failures. We start every flooring remodel by pulling up the existing surface and evaluating the subfloor directly. If there's moisture, we deal with it before any new material touches the ground. If it's out of level, we correct it. Skipping that step to save time is how you end up with a floor that feels hollow in three spots and starts peaking at the seams by year two. We won't do it that way. The prep adds time to the job, and it's worth every hour of it.

Materials

Choosing the Right Flooring for How You Actually Live

Not every material is right for every room. Here's how we help you pick.

01

Luxury Vinyl Plank

Water-resistant, durable, and forgiving on subfloors that aren't perfectly level. A smart choice for kitchens, bathrooms, and any room with kids or pets.

02

Laminate

Harder underfoot than LVP and a strong look at a lower cost. It needs a stable, dry subfloor and doesn't belong in wet areas, but in the right room it holds up well for years.

03

Hardwood

The most durable surface long-term if the subfloor and moisture levels are in good shape. Refinishable, which means one good installation can outlast the house it's in.

04

Tile Transitions

Where flooring meets existing tile work, the transition detail matters as much as the field. We cut and fit transitions so the seam looks intentional, not patched.

Our Process

How We Handle a Flooring Job Start to Finish

Three stages, no handoffs. The same person who scopes the job installs it.

  1. 01

    Subfloor Assessment

    We inspect for level, moisture, and structural condition before committing to any material or timeline. If something needs to be corrected, we tell you upfront.

  2. 02

    Material and Layout

    We plan the layout to minimize waste and maximize the visual result, including how planks run relative to the room's longest wall and natural light source.

  3. 03

    Installation and Finish

    Clean cuts at every wall, tight seams throughout, transitions fitted properly, and baseboard repair or reinstallation handled before we leave the site.

What a Complete Flooring Installation Covers

A flooring remodel involves more steps than most homeowners expect. Here's what we handle.

  1. 01

    Removal and Disposal

    Old flooring comes out cleanly and goes with us. You don't sort or haul anything.

  2. 02

    Subfloor Prep

    Level, dry, and structurally sound before any new material is placed.

  3. 03

    Precision Installation

    Every cut is measured. Seams are tight. Corners and transitions are finished, not approximated.

  4. 04

    Final Trim and Cleanup

    Baseboards reinstalled, molding repair addressed where needed, and the room left clean.

Owner-Operated Means One Person Accountable

Dominique Willis is not a dispatcher. When you call Hundredfold Services, you're talking to the person doing the work.

There's no crew rotation, no subcontractors brought in for the flooring portion of a bigger job, and no handoff between the person who scoped it and the person who installed it. That matters because someone who owns the outcome inspects their own work differently than someone clocking hourly. If something isn't right before we leave, we make it right before we leave. That's the practical difference between an owner-operated business and a managed crew.
Direct contact with Dominique
No dispatcher, no call queue, no being passed around.
One person scopes and installs
The accountability doesn't transfer when the job starts.
Part of a broader [remodeling](/remodeling/) capability
Flooring is one piece of what we handle under one call.

Questions About Flooring Remodel Jobs

What should go down before installing vinyl plank flooring?
The subfloor needs to be clean, dry, and flat to within 3/16 of an inch over an 8-foot span before LVP goes down. Depending on the existing surface, that may mean scraping adhesive residue, filling low spots with floor leveling compound, or pulling up a layer of old vinyl tile. A moisture barrier or underlayment typically goes on top of that. Skipping any of these steps causes the planks to flex, peak at seams, or shift over time.
How much does it cost to install 1,000 square feet of flooring?
The range is wide for a reason. Material choice alone can shift the number significantly, and subfloor condition, room configuration, the number of transitions, and whether baseboards need to come off all add to the scope. We won't give a per-square-foot number that doesn't reflect your actual job. Every job is different, so contact Hundredfold Services for an accurate estimate once we've seen the space.
Can new flooring go over existing flooring?
Sometimes, but it's not always the right call. Installing over existing flooring raises the finished height, which creates problems at doorways, thresholds, and transitions to adjacent rooms. It also means you're trusting a subfloor you haven't seen. In most cases, pulling the old surface gives us a chance to inspect what's underneath and correct anything before the new floor goes down. We'll give you an honest answer on whether overlay makes sense for your specific situation.
What is the Rule of 3 for flooring layout?
The Rule of 3 is a layout principle that says no two joints in adjacent rows of plank flooring should land within three inches of each other. Staggering the joints properly distributes stress across the floor and keeps the pattern from looking like a grid. It's one of those details that's invisible when it's done right and obvious when it's not. We plan the layout before the first plank drops to get the pattern and the waste calculation right from the start.
How long does a flooring installation take for an average room?
A single room with a straightforward subfloor typically takes one full day from material staging to baseboard reinstallation. Larger areas, subfloor repairs, or rooms with complex cuts around cabinets and hearths take longer. We give you a realistic timeline before we start, not an optimistic one. If general home maintenance items in the same space make sense to handle in the same visit, we'll let you know.
Does new flooring affect baseboards and trim?
Yes. Baseboards almost always need to come off before installation and go back on after. If the existing baseboards are in good shape, we reinstall them. If they've been painted over multiple times, were cut short, or are damaged, we can handle baseboard repair and molding repair as part of the same job so the finished room looks complete, not patched.

Ready to Remodel Your Flooring? Call Dominique.

One call handles the whole job, from subfloor to finished trim.

Related